Audio Conference Translation Equipment Battery Charger Simultaneous Interpreter System
Features
The battery is exclusively designed to directly charge the IR receiver TS-703, which is used inside the IR wireless simultaneous interpretation system. It is designed with portable strong protection box easy for rentable and mobile use. It permits up to 24 batteries simultaneously charged. Charging time is about 3 to 6 hours. Power supply of AC220V or 115V, 50-60Hz. Built-in over charge protection to protect the lithium battery life span. With charging red indicator and full green indicator.
Model
|
FTS-805
|
Description
|
Battery Charger
|
Power Supply
|
AC220V or 115V, 50-60Hz
|
Power Consumption
|
200W
|
Charging Qty
|
24 units
|
Charging Time
|
3 to 6 hours
|
Indicator
|
Red indicator flashing-charging, green indicator-full charged
|
Operation Temp
|
0ºC to +40ºC
|
Dimension
|
455(W)×340(D)×320(H)mm
|
Weight
|
10.75kg
|
Company Profile
Guangzhou FTD Audio Limited is a leading manufacturer of Public Address System and Conference System in China, We are focus on R&D and our Professional R&D team already 15 years′ experience on Audio field. FTD audio will offer the professional products and
service to each of partner and do a win win business with our partners!
Our main products are Public address system ,EVAC system, IP PA system ,conference system ,PA amplifier and PA speaker.These
system are all designed and produced by our engineer. We are accept OEM,ODM order.
1. Are you manufacturer?
Yes, we are public address system manufacturer located in Guangzhou, China.
Welcome to visit our factory.
2. Is sample order available? Is free sample available?
Firstly, sample order is available. Secondly, for new clients, we will return the sample fee after big order placed.
3. What's your warranty period?
Our warranty period is 12 months for speaker.
4. What's your payment terms?
We accept Western Union and TT. 30% deposit in advance, balance 70% before shipment.
5. Where is your main market?
Customers are mainly from Europe, Middle East and South Asia.
6. How many days do you need to prepare for the goods?
It takes 30 working days for large order.